17
4

So, how do you decide if a way is a bridge over another way, or if it has a tunnel going under it?

Here are some examples, all involving a railway track that's a cutting, with roads going over it at various points:

Would this be a bridge? It's only the width of the road (which in my mind would be too short for a tunnel), but the road doesn't raise up to go over the railway, as the track is at a lower level..

alt text


How about this? I thought this made sense being marked as a tunnel, as it's clearly going under various roads, and it's a relatively long section.

alt text


This seems borderline again.. bridge or tunnel?

alt text


I suppose layers come into this as well don't they? I assume the track should be marked as cutting=yes and layer=-1. The bridge could be explicitly marked as layer=0 to signify that there is no change in level as it crosses the other way. Or would that not make sense to do? Should the track just be marked as having a section of tunnel?

asked 21 Jun '11, 21:28

Sekai's gravatar image

Sekai
291558
accept rate: 0%

edited 22 Jun '11, 13:01

dieterdreist's gravatar image

dieterdreist
3.6k113466

1

I always do it on method of construction; therefore, the above three would likely all be bridges. Definitely, 1 and 3 are.... 2 might be considered a cut-and-cover tunnel.... survey might be needed (o;

(22 Jun '11, 01:17) c2r
1

I changed level to layer in your post, because the commonly used tag is layer.

actually layer=0 is default and can be avoided (you might still want to use it to emphasize that you didn't simply forget to put it). Layers in OSM don't actually say if something is below or above ground, they only come to play in relation to other objects crossing them: the higher the layer is the higher is the feature in the order of overlapping features.

(22 Jun '11, 13:04) dieterdreist

Using bride or tunnel, you can completely get rid of the layers=* They really only play a role if some features cross WITHOUT a bridge or tunnel or if there is more than one bridge/tunnel crossing at the same point. They are only a hint to the renderer what to draw on top and carry no other meaning in terms of height. But for bridges/tunnels, the renderer already knows what to do.

(19 Aug '13, 16:18) Chaos99
1

youll get a complaint adding a bridge over a way, without a tag layer 1 or -1.

(19 Aug '13, 21:56) Hendrikklaas

7 Answers:
10

Down the pub one time we suggested the simple rule: "If the road passing under is longer (underneath) than the gap is wide, then it should be a tunnel on the under way, rather than a bridge on the over way." ....But we were all completely drunk at the time :-)

By that rule I'd say your second and third images are both tunnels (and that is how I would map them), but your first one is 50/50. Could be a bridge. See comments on my diary for some further discussion. I've also just added a specific section to the wiki where we should one day answer this question.
[update] : The wiki page was modified to carry some more specific advice, which is good I guess. See the discussion here

But on the whole I agree with Vincent de Phily. If you have a case where you can't decide between bridge or tunnel... well then it probably doesn't matter too much. Getting levels right matters more (mainly to help the renderers). Avoiding connections where there are none is important (To avoid routing problems)

permanent link

answered 21 Jul '11, 18:58

Harry%20Wood's gravatar image

Harry Wood
9.3k2486126
accept rate: 13%

edited 08 Feb '12, 13:51

9

That's always going to be a little subjective. To me the presence/absence of a slope on the top/bottom highway doesn't make a difference. The construction type is tempting, but I can see many cases were it will not yield a definite answer. I'd say if the bottom highway crosses a single feature (however broad the feature may be) it's a bridge, otherwise it's a tunnel. So I'd rate your 1&3 as bridges, 2 as tunnel.

YMMV. In the end it's not a big issue, the main thing is to have no connectiing nodes and to have the layers right.

permanent link

answered 22 Jun '11, 10:55

Vincent%20de%20Phily's gravatar image

Vincent de P... ♦
17.0k16147244
accept rate: 19%

4

+1 The difference between tunnel and bridge is really somewhat arbitrary, and not really important for most applications. The important thing (especially for routing) is to use layers (because that indicates that it's not a level crossing). If it's ambiguous, just choose one; the rule of thumb given looks fine.

(22 Jun '11, 11:29) sleske

Sorry, in my comment above "levels" should have been "layers", as that is the right tag to use.

(29 Apr '15, 12:21) sleske

@sleske: I've edited it – better now? :-) Then please delete your and my (this) comment.

(29 Apr '15, 12:29) aseerel4c26 ♦
5

Technically these structures are all bridges (because not dug in the massive earth but constructed openly and then later covered, and not longer then 80 / 160 metres). I would still tag 1 and 3 as bridge and 2 might be better represented as tunnel in osm (because otherwise you would miss the start and end of the covered part of the way, and you might end up with lots of parallel bridges what I would consider a worse representation compared to a simple tunnel for the way below).

permanent link

answered 22 Jun '11, 12:58

dieterdreist's gravatar image

dieterdreist
3.6k113466
accept rate: 3%

3

+1 good point about the "multiple parallel bridges". That's something that often bothers me with OSM renderings.

(06 Jul '11, 02:10) sleske

I'd agree they are all bridges. Surely a tunnel implies tunneling through some sort of natural feature?

(29 Jul '11, 00:04) EdLoach ♦

I solved the paralel bridges with highway areas & railway areas. Then went on to map road widths with areas too. The routeing lines stay to as they are linked and tagged like in comercial products to aid simplifed routing algorithiums.

(01 May '14, 21:50) Govanus
1

Imagery is not the main way data should ideally be collected for OSM, ground surveying is.

The best way to get data into OSM is to go to the place and check it out. Take your GPS with you, collect tracks, make observations.

If you want to know if it's a bridge or a tunnel, head over there and check it out.

If it's not near you, then focus on what is! You should be mapping what's local to you, what you can observe yourself, and use the imagery as a backup.

permanent link

answered 22 Jun '11, 03:29

emacsen's gravatar image

emacsen
1.2k1423
accept rate: 13%

6

While what you say is true, it's offtopic I think. Going on-site probably won't make things clearer in this case. For all we know, the OP might have been on-site and know the area well, but used aerial imagery to illustrate his question.

(22 Jun '11, 10:58) Vincent de P... ♦
1

You hit the nail on the head Vincent. Thanks for the advice though emacsen!

(22 Jun '11, 12:03) Sekai

I try to to do this mostly seeing the site and possibly taking down notes before using the corrected offset satelight/arial pics to line things up at a drawing out stage. Sometimes when I try using JOSM with no internet and no imagry my attempts are delibratly errored to make it more obvious that the fetures like building outlines still need correction. Still I'd still be pondering after having stared at a long overbridge about this issue.

(01 May '14, 21:20) Govanus
1

Alas even knowing the structure may still be ambiguous, a cut and cover tunnel is in essence a very wide bridge. Adding to the abiguity are some larger culverts which typically I'd consider a tunnel, but some may consider a bridge

http://www.dot.state.oh.us/Divisions/Communications/BridgingtheGap/PublishingImages/box-culvert.jpg http://utca.eng.ua.edu/projects/final_reports/00219report_files/image106.jpg

permanent link

answered 21 Jul '11, 21:43

Sundance's gravatar image

Sundance
467511
accept rate: 3%

3

So you're saying most of the NYC subway isn't really underground, the street above is just a bridge?

(29 Jul '11, 07:18) Paul Johnson
1

cut and cover constructions are technically considered tunnels if they are very long (e.g. at least 80m in Germany, 160m in the USA). I'd consider the box culvert in your first image a bridge.

(29 Jul '11, 08:44) dieterdreist
1

No I'm saying the construction techniques for a some cut and cover tunnel can be identical to a bridge. A good example of this would be the Seattle freeway lids on Mercer Island and soon to be on State Route 520.

The longer curved one, okay tunnel, the shorter ones, bridge or tunnel is more ambiguous http://www.openstreetmap.org/?lat=47.5881&lon=-122.23165&zoom=15&layers=M

And yes I would map a cut and cover tunnel as a tunnel. There is some vagueness in some wider bridges as in this example, or in some culverts.

(04 Aug '11, 17:10) Sundance

cut and covers are very common for underpasses and metros alike seem bottom catch all solution.

(01 May '14, 21:43) Govanus
-1

These should all be tagged as bridges, because they are bridges. Don't tag something as a tunnel just because it looks nicer in mapnik.

permanent link

answered 21 Jul '11, 15:27

Janjko's gravatar image

Janjko
30839
accept rate: 0%

-1

if your simply maping a single line for a route then on the over route put a bridge section across all the apans in one (unless a bank (like an earth bank) is used between spans). Then on the other route mark it as a tunnel from the point it passes under to the point it emerges. add appropiate elevation higt and level tags to fit with surounds such as buildings with indor and basement level features etc.

In this way the fact that the tunnel is very short under the bridge is recorded and the systems can easily handle the relationships to their own needs.

The use of level tags is important idealy if the bridge went over flat across a cutting it would fair to say that the level was 0 (or the same as the reast of the line for elevated routes espcially relating to urban buildings with indoor level plans [think more of a ubrban scape with roads raised off the ground and interacting with the upper floors of buildings possibly with entrances or by passing through them entirly enveloped for a stretch).

I'd consider a higher level (and elevation hight) either for midway nodes or bridge line sections if it were hump-backed [a bridge whose over path rises to get above and over a suporting arch] and for simlar varient cases].

Its worth noteing this helps when handleing [automaticly] complex transport junctions with stacked bridges and viaducted canals snd railways passing over and under each other in a small area like in Brimingham Britain.


Spegetti-junction on the M6 at Birmingham, UK, EU. This example shows arange of moterways mainroads cyclepths local road and rregional distributer roads Weaving link roads and canals rivers and railway services.

Even before railways birmingham had similar major junctions on the canal system complete with aquduct overpasses and lock-ed link routes to ease the heavy barge traffic!

Sticking to one level may be difficult. Ireality they are built with undulating bridges with some of the older routes in cuttings tunnels and embankments.

permanent link

answered 01 May '14, 21:42

Govanus's gravatar image

Govanus
1553711
accept rate: 3%

edited 05 May '14, 19:16

  1. Don't mark both a tunnel and bridge unless there really is a bridge crossing above a tunnel, which would be exceedingly rare. In nearly all cases it's one or the other, but not both.

  2. Don't tag different parts of a bridge with different layer tags just because it's hump-backed. That isn't what the layer tag is for. It's only for determining the relative position of objects (ie. one object passes above another), not for any kind of elevation change. If one bridge is crossing one other way, the entire bridge should have a layer one step higher than the way underneath.

(02 May '14, 17:01) alester

probably fair enough about a basic humpback and levels but when link road weave up and down as they pass it could be tough to keep to one level. I think I had other cases in mind like elevated and undground service that have connections to buildings at that aren't at ground level like in soul corea.

for isea of the weaveing I'll append an image to the main answer.

(05 May '14, 19:07) Govanus

@Govanus please stop reopening extremly old questions

(05 May '14, 19:30) SimonPoole ♦

It doesn't matter if a link road weaves up and down. The physical shape of the road has no relation to the layer tag. The layer tag only indicates the vertical relationship between two crossing ways. That is, it simply indicates one way passes above or under another. Nothing more, nothing less. If you want to represent the changing physical height of a road, the ele=* tag is what you want.

(06 May '14, 00:20) alester

Markdown Basics

  • *italic* or _italic_
  • **bold** or __bold__
  • link:[text](http://url.com/ "title")
  • image?![alt text](/path/img.jpg "title")
  • numbered list: 1. Foo 2. Bar
  • to add a line break simply add two spaces to where you would like the new line to be.
  • basic HTML tags are also supported

Question tags:

×77
×61
×23
×21

question asked: 21 Jun '11, 21:28

question was seen: 20,157 times

last updated: 29 Apr '15, 12:29

powered by OSQA